06-30-07
Part of what has stalled the house work for a while is not knowing what we wanted to do with the garage loft. We finally decided to make an executive bedroom with a bath and private sitting area next to the south dormer. The sheetrock is on the ceiling of the garage loft which means the nessessary wiring and plumbing also in the ceiling. The interior walls can now be done. Here are some pictures of the garage loft;
Loft 1
Loft 2
Loft 3
The other sign of life is in the kitchen, we installed the cabinets; Here is a picture of the kitchen;
Kitchen.
The cooktop will go by the window below the unfinished ceiling. The ceiling is unfinished there because I have to design and built a custom stove hood there. The sink will be by the other window, the dishwasher in the opening by the sink. Our current plan is to use wood just like on our floor for countertop.